What you get
- Quantities from the drawings or your measurements, recomputed in the quote.
- Spec sheets and install drawings from the manufacturer for the submittal (crash-rated systems come with their foundation drawing).
- Delivery to site, with what’s needed to unload noted (precast barriers and curbs are heavy).
Installer notes
- Core at least 2 in over the post and take footings below frost (core-drilled).
- Pour-in-place posts go on the pour schedule (embedded).
- A rated bollard is only rated on its tested foundation: build to the drawing.